I 495 over COMB MERRIMAC ST & MBTA

.32 KM S MERRIMAC RIVER · County 009, Massachusetts · Built 1962 · 6 Lanes · 96,595 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L040372XBDOTNBI
Year Built
1962
Length
119.2 m (391.1 ft)
Max Span
31.3 m
Width
29 m (95.1 ft)
Lanes
6
Daily Traffic
96,595
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$22,593,000
Total Project Cost
$33,890,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.