HWY CANAL ST over WATER SPICKET RIVER

0.1 6 KM WEST OF MARSTON · County 009, Massachusetts · Built 2013 · 5 Lanes · 18,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L04051AE5MUNNBI
Year Built
2013
Length
41.1 m (134.8 ft)
Max Span
39.6 m
Width
24.6 m (80.7 ft)
Lanes
5
Daily Traffic
18,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,542,000
Total Project Cost
$3,814,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.