HWY HAVERHILL ST over WATER SPICKET RIVER

0.8 KM EAST ST 110 · County 009, Massachusetts · Built 1939 · 2 Lanes · 7,232 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L040152Q4MUNNBI
Year Built
1939
Length
21.3 m (69.9 ft)
Max Span
20.4 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
7,232
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,271,000
Total Project Cost
$3,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.