I 495 SB over HWY RAMPS A & B

.3 MI N MERRIMAC RIVER · County 009, Massachusetts · Built 1962 · 3 Lanes · 64,284 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
L040392X8DOTNBI
Year Built
1962
Reconstructed
2002
Length
43.9 m (144 ft)
Max Span
25.6 m
Width
27.2 m (89.2 ft)
Lanes
3
Daily Traffic
64,284
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,409,000
Total Project Cost
$12,614,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.