I 190 NB over WATER N NASHUA RIVER

0.3 MI N OF ST117/EXIT 17 · County 027, Massachusetts · Built 1977 · 3 Lanes · 26,866 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L020231VUDOTNBI
Year Built
1977
Length
95.1 m (312 ft)
Max Span
42.7 m
Width
14.8 m (48.6 ft)
Lanes
3
Daily Traffic
26,866
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,224,000
Total Project Cost
$13,837,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.