I 190 NB over ST117 N MAIN ST

MM 16.8/EXIT 17 · County 027, Massachusetts · Built 1977 · 2 Lanes · 19,428 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L020221VQDOTNBI
Year Built
1977
Length
64.6 m (211.9 ft)
Max Span
30.2 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
19,428
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,157,000
Total Project Cost
$1,736,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.