I 495 NB over HWY RIVER RD

@MM 65.6 · County 017, Massachusetts · Built 1963 · 3 Lanes · 49,446 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H2501727HDOTNBI
Year Built
1963
Length
40.8 m (133.9 ft)
Max Span
19.9 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
49,446
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,045,000
Total Project Cost
$3,068,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.