ST 62 OLD BSTN TPK over WATER W BR WARE RIV TRIB

EAST OF FIRE TRUCK FILL · County 027, Massachusetts · Built 2021 · 2 Lanes · 1,550 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H24027C2MMUNNBI
Year Built
2021
Length
7.8 m (25.6 ft)
Max Span
7.3 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
1,550
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0