HWY EVERGREEN RD over WATER MASON BROOK

0.6 MI. E. OF ST-68 · County 027, Massachusetts · Built 2021 · 2 Lanes · 780 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H24009BYTMUNNBI
Year Built
2021
Length
10.4 m (34.1 ft)
Max Span
9.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
780
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.