HWY NEW WSTMNSTR over WATER JOSLIN BROOK

3 MI W OF WESMSTR T/L · County 027, Massachusetts · Built 2004 · 2 Lanes · 1,647 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
H24022835MUNNBI
Year Built
2004
Length
7 m (23 ft)
Max Span
2.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,647
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$546,000
Total Project Cost
$820,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.