HWY BRIGHAM ST over WATER BRIGHAM POND INLET

.6 MI E OF RTE 68 · County 027, Massachusetts · Built 1939 · 2 Lanes · 1,741 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
H240111C1MUNNBI
Year Built
1939
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
1,741
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$536,000
Total Project Cost
$805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.