ACCESS ROAD over SPILLWAY CHANNEL

12.9 KM S OF GARDNER · County 027, Massachusetts · Built 1957 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
CEPNEDMA2510011
Year Built
1957
Length
29.5 m (96.8 ft)
Max Span
28.9 m
Width
6.3 m (20.7 ft)
Lanes
2
Daily Traffic
75
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$329,000
Total Project Cost
$330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.