PINE PLAINS ROAD over MUDDY POND BROOK

12.9 KM S OF GARDNER · County 027, Massachusetts · Built 1938 · 2 Lanes · 20 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
CEPNEDMA2510012
Year Built
1938
Length
16.6 m (54.5 ft)
Max Span
4.3 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
20
Material
Steel
Design
Culvert
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$44,000
Total Project Cost
$46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.