HWY STONEHSE HLL over WATER RESERVOIR OUT
.1 MI N OF RESERVOIR ST · County 027, Massachusetts · Built 1993 · 2 Lanes · 130 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.296133, -71.865728
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 33 years old.
Nearby Bridges
HWY MOWER ST over WATER TATNUCK BROOK
Built 1920
ST122 PLEASANT ST over WATER TATNUK BROOK
Built 1937
HWY MILL ST over WATER TATNUCK BROOK
Built 1992
HWY JUNE ST over WATER TATNUCK BROOK
Built 1905
I 190 SB over HWY SHORE DR
Built 1976
I 190 NB over HWY SHORE DR
Built 1976
I 190 SB RAMP C over HWY W BOYLSTON DR
Built 1977
I 190 SB over HWY W BOYLSTON DR
Built 1977
I 190 NB over HWY W BOYLSTON DR
Built 1977
I 190 SB over ST 12 SB
Built 1977
Bridge Details
- Structure #
- H18013ACKMUNNBI
- Year Built
- 1993
- Length
- 27.5 m (90.2 ft)
- Max Span
- 26.3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,615,000
- Total Project Cost
- $2,423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.