HWY MILL ST over WATER TATNUCK BROOK

500 FT S OF CHANDLER ST · County 027, Massachusetts · Built 1992 · 2 Lanes · 7,714 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W440021DPMUNNBI
Year Built
1992
Length
14 m (45.9 ft)
Max Span
13.1 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
7,714
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,744,000
Total Project Cost
$2,617,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.