HWY NEW BRIDGE over RR MBTA
MP 15/950 MBCR · County 023, Massachusetts · Built 1900 · 2 Lanes · 5,948 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.230942, -70.905253
This bridge is in worse condition than 32.3% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 126 years old.
Nearby Bridges
ST 3 A/CSHNG HWY over RR MBTA
Built 1932
ST 3 A/LINCOLN ST over WATER BACK RIVER
Built 1943
HWY NARAGNST AVE over RR MBTA
Built 1966
HWY IDLEWELL ST over RR MBTA
Built 2006
HWY G WSHNGTN BL over WATER WEIR RIVER
Built 1987
HWY LIB IND PKWY over WATER SWAMP RIVER
Built 1992
ST 3 NB over HWY PLEASANT ST
Built 1957
ST 53 QUINCY AVE over WATER MONATIQUOT RIVER
Built 1919
ST 3 A over WATER FORE RIVER
Built 2018
ST 3 SB over HWY PLEASANT ST
Built 1957
Bridge Details
- Structure #
- H150014C7DOT634
- Year Built
- 1900
- Reconstructed
- 1957
- Length
- 19.2 m (63 ft)
- Max Span
- 11.6 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 5,948
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,340,000
- Total Project Cost
- $2,011,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.