ST 3 A/CSHNG HWY over RR MBTA

MBTA/MBCR MP 17/811 · County 023, Massachusetts · Built 1932 · 2 Lanes · 23,017 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
H1500547LDOTNBI
Year Built
1932
Reconstructed
2003
Length
18.9 m (62 ft)
Max Span
17.4 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
23,017
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.