HWY UPR CNTY BRI over WATER MERRIMACK RIVER

AT WSHGTN &RIVER STS · County 009, Massachusetts · Built 1906 · 2 Lanes · 10,682 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H1200630XDOTNBI
Year Built
1906
Reconstructed
2007
Length
261.5 m (857.9 ft)
Max Span
47.6 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
10,682
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,554,000
Total Project Cost
$26,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.