HWY FERRY RD over RR MBTA/BMRR
.1 MI. N ST125 · County 009, Massachusetts · Built 2013 · 2 Lanes · 2,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
42.755331, -71.105878
This bridge is in worse condition than 4% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 13 years old.
Nearby Bridges
ST125 CONN WB over COMB FERRY RD&MBTA/BMRR
Built 1961
ST125 CONN EB over COMB FERRY RD&MBTA/BMRR
Built 1961
ST125 CONN EB over I 495
Built 1961
ST125 CONN WB over I 495
Built 1961
I 495 NB over WATER MERRIMACK RIVER
Built 1964
I 495 SB over WATER MERRIMACK RIVER
Built 1964
I 495 NB over WATER MERRIMACK RIVER
Built 2021
I 495 NB over ST110 /ST113/MERRIMACK
Built 1963
I 495 SB over ST110 /ST113/MERRIMACK
Built 1963
I 495 SB over WATER MERRIMACK RIVER
Built 2022
Bridge Details
- Structure #
- H12005ADPDOT634
- Year Built
- 2013
- Length
- 23 m (75.5 ft)
- Max Span
- 19.7 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,400
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,646,000
- Total Project Cost
- $2,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.