I 495 SB over WATER MERRIMACK RIVER

.4 MI S ST110 · County 009, Massachusetts · Built 2022 · 3 Lanes · 62,167 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
H12039C33DOTNBI
Year Built
2022
Length
220 m (721.8 ft)
Max Span
84.7 m
Width
21.6 m (70.9 ft)
Lanes
3
Daily Traffic
62,167
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.