ST 97 BROADWAY over I 495 SB

1.1 KM N MERRIMAC RIVER · County 009, Massachusetts · Built 1961 · 4 Lanes · 48,897 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
H1204330HDOTNBI
Year Built
1961
Length
53.3 m (174.9 ft)
Max Span
21.7 m
Width
28.3 m (92.8 ft)
Lanes
4
Daily Traffic
48,897
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,922,000
Total Project Cost
$14,884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.