HWY N BROADWAY over I 495 NB

1.3 MILES N MERRIMAC RIVR · County 009, Massachusetts · Built 1961 · 2 Lanes · 6,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
H12045312DOTNBI
Year Built
1961
Length
43.6 m (143 ft)
Max Span
22.6 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
6,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,257,000
Total Project Cost
$6,386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.