ST125 CONN WB over COMB FERRY RD&MBTA/BMRR
1 MI E I495 · County 009, Massachusetts · Built 1961 · 2 Lanes · 13,000 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.751217, -71.109372
This bridge is in worse condition than 39.1% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 65 years old.
Nearby Bridges
ST125 CONN EB over COMB FERRY RD&MBTA/BMRR
Built 1961
HWY FERRY RD over RR MBTA/BMRR
Built 2013
I 495 NB over WATER MERRIMACK RIVER
Built 1964
I 495 SB over WATER MERRIMACK RIVER
Built 1964
ST125 CONN EB over I 495
Built 1961
ST125 CONN WB over I 495
Built 1961
I 495 NB over ST110 /ST113/MERRIMACK
Built 1963
I 495 SB over ST110 /ST113/MERRIMACK
Built 1963
I 495 NB over WATER MERRIMACK RIVER
Built 2021
I 495 SB over WATER MERRIMACK RIVER
Built 2022
Bridge Details
- Structure #
- H120572RRDOTNBI
- Year Built
- 1961
- Reconstructed
- 2012
- Length
- 64.9 m (212.9 ft)
- Max Span
- 20.7 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 13,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,697,000
- Total Project Cost
- $8,546,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.