HWY CHESTNUT ST over WATER MILL RIVER

AT JCT OF CIRCLE DR · County 015, Massachusetts · Built 1959 · 2 Lanes · 2,715 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
H110050QPMUNNBI
Year Built
1959
Length
21.5 m (70.5 ft)
Max Span
5.2 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
2,715
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,072,000
Total Project Cost
$1,609,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.