US 5 /ST10/WEST over WATER MILL RIVER

100N JCT ON RAMP EXIT30 · County 015, Massachusetts · Built 1963 · 2 Lanes · 8,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
H110310U6DOTNBI
Year Built
1963
Length
22.9 m (75.1 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
8,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$714,000
Total Project Cost
$1,072,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.