I 91 NB over WATER MILL RIVER

AT EXIT #22 I-91 · County 015, Massachusetts · Built 1963 · 2 Lanes · 17,181 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
H110290Y3DOTNBI
Year Built
1963
Length
23.9 m (78.4 ft)
Max Span
7.7 m
Lanes
2
Daily Traffic
17,181
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$705,000
Total Project Cost
$1,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.