HWY PROSPECT ST over WATER MILL RIVER

0.3 MI N OF ELM ST. · County 015, Massachusetts · Built 1977 · 2 Lanes · 2,175 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
H110030QNMUNNBI
Year Built
1977
Length
53.9 m (176.8 ft)
Max Span
25.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,175
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,861,000
Total Project Cost
$4,292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.