HWY ELM ST over RR GWRR

.2 M E JCT US 5 & ST 10 · County 015, Massachusetts · Built 1963 · 2 Lanes · 13,319 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
5
Fair
Substructure
2
Critical

Bridge Details

Structure #
H1102512VDOTNBI
Year Built
1963
Length
77.2 m (253.3 ft)
Max Span
18.6 m
Width
16.1 m (52.8 ft)
Lanes
2
Daily Traffic
13,319
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,264,000
Total Project Cost
$18,397,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.