HWY COTTAGE ST over WATER HOUSATONIC RIVER

0.5M S JCT RTS41&7 · County 003, Massachusetts · Built 1934 · 2 Lanes · 240 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
G1100604HMUNNBI
Year Built
1934
Reconstructed
1961
Length
40.8 m (133.9 ft)
Max Span
37.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
240
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$6,490,000
Total Project Cost
$9,736,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.