ST 23 MONTEREY RD over WATER TOM PALMER BROOK

150 E. OF E. MOUNTAIN RD · County 003, Massachusetts · Built 1950 · 2 Lanes · 6,207 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
G110300C9DOTNBI
Year Built
1950
Length
9.7 m (31.8 ft)
Max Span
9.7 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
6,207
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$861,000
Total Project Cost
$1,292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.