US 7 STOCKBRIDGE over WATER TOM PALMER BROOK

AT ST.PETERS/ELMWOOD CEM. · County 003, Massachusetts · Built 1953 · 3 Lanes · 11,448 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
G1102109NDOTNBI
Year Built
1953
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
11,448
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$644,000
Total Project Cost
$967,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.