HWY HURLBURT RD over WATER GREEN RIVER

0.9M NORTH RT 71 · County 003, Massachusetts · Built 1958 · 2 Lanes · 1,164 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
G1101304NMUNNBI
Year Built
1958
Length
47.2 m (154.9 ft)
Max Span
21.9 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,164
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,712,000
Total Project Cost
$4,069,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.