ST 28 SB over HWY BRICK KILN RD

4.25 M S OF BOURNE TL · County 001, Massachusetts · Built 1959 · 2 Lanes · 19,396 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F0302945PDOTNBI
Year Built
1959
Length
36 m (118.1 ft)
Max Span
16.8 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
19,396
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,315,000
Total Project Cost
$4,973,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.