HWY CHAPOQUOIT over WATER W FALMOUTH HARBOR

CHAPOQUOIT/W. FALMOUTH HA · County 001, Massachusetts · Built 2012 · 2 Lanes · 928 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
F03009B1YMUNNBI
Year Built
2012
Length
44.5 m (146 ft)
Max Span
10.3 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
928
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,146,000
Total Project Cost
$3,220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.