HWY NASHAWENA ST over WATER W FALMOUTH HARBOR

.7 MI W OF RTE 28 · County 001, Massachusetts · Built 1992 · 2 Lanes · 4,655 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
F0301043GMUNNBI
Year Built
1992
Length
7.5 m (24.6 ft)
Max Span
6.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
4,655
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$854,000
Total Project Cost
$1,282,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.