ST 28 SB over RR MACRR

1 M S OF BOURNE TL · County 001, Massachusetts · Built 1960 · 3 Lanes · 13,603 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
F0303145UDOTNBI
Year Built
1960
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
14 m (45.9 ft)
Lanes
3
Daily Traffic
13,603
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,545,000
Total Project Cost
$3,818,000