ST151 NATHAN ELLIS over RR MACRR (OTIS SPUR)

0.75 M S OF BOURNE TL · County 001, Massachusetts · Built 1941 · 2 Lanes · 40,345 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F030264BPDOT634
Year Built
1941
Length
37.2 m (122 ft)
Max Span
12.8 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
40,345
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,974,000
Total Project Cost
$7,462,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.