ST 28 E FALMTH HWY over WATER COONAMESSET RIVER

3.5 M W OF MASHPEE TL · County 001, Massachusetts · Built 1953 · 2 Lanes · 36,595 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F0301647PDOTNBI
Year Built
1953
Length
19.2 m (63 ft)
Max Span
6.1 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
36,595
Material
Wood or Timber
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,117,000
Total Project Cost
$3,176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.