HWY HGHLND AV NB over ST 24 SB

NEAR ST 79/ST 24 SB · County 005, Massachusetts · Built 1954 · 2 Lanes · 876 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 7 Good

Location

41.744278, -71.121917

This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 72 years old.

Nearby Bridges

Bridge Details

Structure #
F0204141ADOTNBI
Year Built
1954
Reconstructed
2010
Length
47.9 m (157.2 ft)
Max Span
46.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
876
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,176,000
Total Project Cost
$6,265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.