HWY SULL & MECH over WATER QUESET BROOK

0.1MI N OF MAIN ST · County 005, Massachusetts · Built 1969 · 4 Lanes · 1,940 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
E060203LFMUNNBI
Year Built
1969
Length
7.6 m (24.9 ft)
Max Span
1.6 m
Lanes
4
Daily Traffic
1,940
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$290,000
Total Project Cost
$436,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.