HWY W CHESTNT ST over WATER COWEESET BROOK

.3 MI W EASTON · County 023, Massachusetts · Built 1970 · 2 Lanes · 14,643 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B25057432MUNNBI
Year Built
1970
Length
16.5 m (54.1 ft)
Max Span
5.2 m
Width
19.5 m (64 ft)
Lanes
2
Daily Traffic
14,643
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,153,000
Total Project Cost
$3,230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.