ST123 /ST138/WSHNG over WATER QUESET BROOK

.1 MI NW OF DEPOT ST · County 005, Massachusetts · Built 1988 · 4 Lanes · 11,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
E060013VKDOTNBI
Year Built
1988
Length
7.3 m (24 ft)
Max Span
3.4 m
Width
18.5 m (60.7 ft)
Lanes
4
Daily Traffic
11,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$878,000
Total Project Cost
$1,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.