HWY CENTER ST over WATER SEGREGANSET RIVER
1 MI.WEST OF ST.138 · County 005, Massachusetts · Built 1850 · 2 Lanes · 2,071 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.84, -71.142792
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 176 years old.
Nearby Bridges
HWY WILLIAMS ST over WATER SEGREGANSET RIVER
Built 1965
HWY HORTON ST over WATER SEGREGANSET RIVER
Built 1930
HWY BROOK ST over WATER SEGREGANSET RIVER
Built 2014
HWY ELM ST over WATER SEGREGANSET RIVER
Built 1956
HWY OLD SMRST AV over WATER THREE MILE RIVER
Built 2009
ST138 SOMERSET AV over WATER THREE MILE RIVER
Built 1932
HWY ELM ST over WATER TAUNTON RIVER
Built 2015
HWY ELM ST over WATER MUDDY COVE BROOK
Built 1959
HWY SPRING ST over WATER THREE MILE RIVER
Built 1959
HWY SPRING ST over WATER THREE MILE RIVER
Built 1956
Bridge Details
- Structure #
- D080083LAMUNNBI
- Year Built
- 1850
- Reconstructed
- 1920
- Length
- 9.1 m (29.9 ft)
- Max Span
- 3.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,071
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $591,000
- Total Project Cost
- $887,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.