HWY ELM ST over WATER TAUNTON RIVER

OVER TAUNTON AT DIGHTON · County 005, Massachusetts · Built 2015 · 2 Lanes · 8,553 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B08001B6PMUNNBI
Year Built
2015
Length
109.4 m (358.9 ft)
Max Span
28.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
8,553
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$6,256,000
Total Project Cost
$9,385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.