HWY SPRING ST over WATER THREE MILE RIVER

@ TAUNTON TOWN LINE · County 005, Massachusetts · Built 1959 · 2 Lanes · 5,302 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D080203JAMUNNBI
Year Built
1959
Length
11.9 m (39 ft)
Max Span
11.3 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
5,302
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$113,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.