HWY WILLIAMS ST over WATER SEGREGANSET RIVER

2.8 MI. S OF TAUNTON T.L. · County 005, Massachusetts · Built 1965 · 2 Lanes · 4,714 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
D0801094NMUNNBI
Year Built
1965
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
2
Daily Traffic
4,714
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$348,000
Total Project Cost
$523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.