HWY GRAPE ST over WATER DWIGHT MFG CANAL

300 N. JCT FRONT ST · County 013, Massachusetts · Built 1943 · 2 Lanes · 130 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
C130150PMMUNNBI
Year Built
1943
Reconstructed
1993
Length
17.8 m (58.4 ft)
Max Span
16.6 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
130
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,005,000
Total Project Cost
$1,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.