US 3 /ST2&16/ALWF over TR RED LINE

.4 MI N OF CONCORD AVE · County 017, Massachusetts · Built 1983 · 4 Lanes · 25,732 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
3
Serious
Substructure
5
Fair

Bridge Details

Structure #
C010314DRDOTNBI
Year Built
1983
Length
22.6 m (74.1 ft)
Max Span
19.8 m
Width
19.2 m (63 ft)
Lanes
4
Daily Traffic
25,732
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,165,000
Total Project Cost
$10,748,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.