ST 2 EB RAMP over WATER ALEWIFE BROOK

1.2 KM E RT 2 & LAKE ST · County 017, Massachusetts · Built 1986 · 2 Lanes · 6,361 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
A100252DQDOTNBI
Year Built
1986
Reconstructed
2021
Length
16.5 m (54.1 ft)
Max Span
14.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
6,361
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.