ST 2 over TR MNUTEMAN BP

JUST W OLD ALEWIFE ROTARY · County 017, Massachusetts · Built 2004 · 4 Lanes · 58,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A10011AE2DOTNBI
Year Built
2004
Length
38 m (124.7 ft)
Max Span
35.9 m
Width
26.4 m (86.6 ft)
Lanes
4
Daily Traffic
58,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$955,000
Total Project Cost
$1,433,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.